Teckna Group drilled and installed connection pipe work as part of ongoing remediation works.
Environmental Works at Narborough
Sheet piling retaining wall at Packington compound
Installation of sheet piling retaining wall to enlarge the recently developed Packington compound.
Read More →Water well installation for Oxford new build house
Hydro-geology report to supply 20,000 litres of water per day for domestic and irrigation use to Oxford new build.
Read More →Water well installation on small Carlisle farmstead
Another succesful water well installed for a client in Carlisle to supply domestic water and irrigation to a small farmstead.
Read More →Installation of new compound at Packington Landfill Site.
Installation of a new compound at Packington Landfill site.
Read More →Teckna Group redevelop Packington Wte generation site
Demolition, installation of concrete retaining wall and diversion of existing drainage.
Read More →9 geothermal boreholes to large residential extension
Installation of 9 geothermal boreholes to a large residential extension.
Read More →March 2012
Geothermal drilling to large residence to start with 7no boreholes 100m deep and connecting pipe work back to building.
Read More →Widening of existing roadway at SITA Packington Wte
Widening of existing roadway to enable extended low loaders to deliver multi-million pound engines.
Read More →February 2012
Teckna Drilling was commissioned by one of our private Clients to provide a drilling report after a drilling company walked off the job while trying to drill 2no 120m geothermal boreholes and only managing to drill 20m, claiming that there was Artesian Water Pressure and that it was “undrillable”. Teckna Drillings geological report showed high […]
Read More →January 2012
Gas field redevelopment works to a number of Midlands sites to commence late January.
Read More →Solo Heating retain Teckna Drilling in Liss
Installation of a further 4no geothermal boreholes
Read More →